:
Job Purpose
Job Purpose Description
Job Context & Major Challenges
Job Context: Aditya Birla Group is India's first truly multinational corporation. A US $40 billion corporation, the Aditya Birla Group is in the League of Fortune 500. It is anchored by an extraordinary force of over 136,000 employees belonging to 42 different nationalities.
Hindalco is one of the leading producers of aluminum and copper. Hindalco ranks among the global top five aluminium majors, as an integrated producer with low-cost alumina and aluminium facilities combined with high-end rolling capabilities and a global footprint in 13 countries. It has a turnover of US$14.8 billion. Hindalco's major products include standard and specialty grade alumina and hydrates, aluminium ingots, billets, wire rods, flat rolled products, extrusions and foil. Some of Hindalco's brands include Everlast aluminium roofing sheets, Freshwrapp aluminium foil, Freshpakk, semi-rigid containers, Permashield, waterproofing, Aluminium foil, Hindalco extrusions, Birla Copper, Birla Gold, Birla Silver.
Gare Palma-IV/5 is an underground coal mine acquired by Hindalco Industries Limited subsequent to the completion of auction process after the mines were cancelled by Honorable Supreme Court vide its order dated 24th September 2014. The mine earlier belonged to M/s Monnet Ispat & Energy Limited who were supplying coal to its Sponge Iron Plant located in Raigarh over a distance of 70 km from mine site. It is one of the largest producing underground mine of India with a capacity of 1MTPA. The mine has multi seam workings with development work being carried out in top two seams i.e Seam -III(Grade G-12) and Seam -II(Grade G-8). Seam -I which is the bottom-most seam is virgin. Prior allottee has developed Seam -II extensively as its coal is of superior quality (G-8 grade) which is against the normal practice of developing top downwards. The mine is being worked with semi-mechanised Board and Pillar method involving drilling and blasting in coal and deployment of LHD's for loading. Coal evacuation from the mine is being done by a long network of belt conveyors which are 12.5km long. Dewatering of the mine is being done round the clock through a network of pumps with an installed capacity of more than 2000GPM. To ensure adequate working condition at the faces good amount of quality air is fed through two mechanical ventilators installed on surface. Power to all the above systems is supplied through 5 nos. of 1250 MVA DG sets. The balance reserves of the mine are 41MT and expected life is between 35-40 years. The mine is proposed to be worked by Hindlaco both departmentally and contractually. Coal extracted from this mine will be consumed for power generation at captive power plants of Hirakud and Lapanga in Orissa. To oversee all the above operations, to ensure system availability, uninterrupted supply of coal to EUP's, liasioning with local stakeholders, state and central authorities and to ensure statutory compliance appointment of Mines Manager is a must, hence the post.
Job Challenges:oCommercial activities to meet or improve on budget, cost, volume and efficiency targets.
MNCJobsIndia.com will not be responsible for any payment made to a third-party. All Terms of Use are applicable.