Job Purpose : Support for Electrical Planning and scheduling for other Coal Mining Projects i.e. Subhadra Project, Bandha Project, IOBP Transmission Line Project etc.
Long Term Planning, conceptualization and Budgeting of Electrical System for 5.6MTPA Open Cast Coal Mining Project

Job Context:

Amelia Coal Block is a greenfield project located in the North Eastern part of the main basin of Singrauli Coal field, Dist. \xe2\x80\x93 Singrauli, Madhya Pradesh. This block has been allotted to M/S THDC India Limited. THDC has appointed Amelia Coal Mining Limited as their MDO. Due to recent crisis of coal in the country, Ministry of power is insisting THDC management to start the production from FY23. Subsequently THDC has proposed to start coal production from FY23.

Job Challenges:

Amelia Coal Mining as MDO has following major challenges.
Statutory Clearances \xe2\x80\x93

  • Procure issuance of EC, FC, CTO & CGWA NOC
  • Reclamation and compliance with the environmental standards
Land Acquisition and R&R -
  • Obtain physical possession of Land on behalf of Authority.
  • Facilitate implementation of the approved R&R policy with shifting of PDFs from Project site
Mining Operations
  • Guaranteed coal production of 5.6MTPA at designated grade and size with OB removal
  • Undertake Progressive Mine Closure and Final Mine Closure
Mining and Associated Infrastructure
  • Construct and maintain Approach and access roads
  • To arrange for requisite power supply for the Coal Mining Project from the state utility / relevant Government Instrumentality on behalf of the authority
  • Construct, operate & maintain CHP and conveyor system for transfer of coal
  • Construct, operate and maintain Railway siding and necessary associated infrastructure
KRA1

All safety compliance & record maintenance as per IER...

All safety compliance & record maintenance as per IERMeasurement DFP- Compliance within timeline

KRA2

Reduction in overall Project Cost considered for the Elec...

Reduction in overall Project Cost considered for the Electrical activities during FY 22-23 by using equipment\'s from other units, reconditioning of them and by doing cost value analysis.

KRA3

Support for Electrical Planning and scheduling for other ...

Support for Electrical Planning and scheduling for other Coal Mining Projects i.e. Subhadra Project, Bandha Project, IOBP Transmission Line Project etc.

KRA4

Temporary Power Supply arrangement before Start of Mining...

Temporary Power Supply arrangement before Start of Mining Operation i.e. Procurement of 500kVA DG Set, installation, erection of related auxiliary equipment, commissioning and getting Statutory permissions for its Operation.

KRA5

Arrangement of proper illumination at Site office, Mining...

Arrangement of proper illumination at Site office, Mining area and other utilities as per DGMS guidelines.

KRA6

Long Term Planning, conceptualization and Budgeting of El...

Long Term Planning, conceptualization and Budgeting of Electrical System for 5.6MTPA Open Cast Coal Mining Project

KRA7

Arrangement of Construction Power for the Project i.e. Fe...

Arrangement of Construction Power for the Project i.e. Feasibility Study of the Route, proper availability of system voltage, analysis of the report considering cost & Time optimization, preparation of BOQ, selection of Contractor and execution.

Aditya Birla Group

Beware of fraud agents! do not pay money to get a job

MNCJobsIndia.com will not be responsible for any payment made to a third-party. All Terms of Use are applicable.


Related Jobs

Job Detail

  • Job Id
    JD3248027
  • Industry
    Not mentioned
  • Total Positions
    1
  • Job Type:
    Full Time
  • Salary:
    Not mentioned
  • Employment Status
    Permanent
  • Job Location
    Madhya Pradesh, India
  • Education
    Not mentioned
  • Experience
    Year