Shall calculate and design of the tunnel structure;
Shall calculate and design of the statics loads;
Shall do geotechnical design;
Shall design layout solutions for tunnel construction;
Shall calculate the geometric dimensions of the boreholes and shaft at beginning and the end of TBM and the end of the excavation section
Shall assess of the tunnel construction impact on the surrounding infrastructure, utilities, objects, buildings, vibration-sensitive equipment;
Shall produce drawings, in accordance with requirements in Annex 3, showing:
tunnel, including rails, drainage systems, emergency exit;
neighboring infrastructure, utilities, buildings;
integration interface between structures and systems;
connection tunnel between two main TBM and tunnel;
dewatering pumps; and
geometric dimensions and structure of the start point, finish point of tunnel structure.
MNCJobsIndia.com will not be responsible for any payment made to a third-party. All Terms of Use are applicable.