Receipt, storage and issue of material (steel, cement, diesel, flyash, equipment spares, consumables, admin items, safety items etc) as per the SOP
Arrange for material collection from local market & procurement of petrol
Use appropriate storage methods for various categories of material.
Issue FIM. Issue Diesel to contractors. Maintain equipment wise diesel consumption data
Review PR and check availability of stock and approve PR
Ensure all incoming materials timely unloading.
Monitor diesel receipt through tanker and unloading of diesel
Collect the diesel requirement on daily basis from all contractors and place the indent for diesel procurement
Clear/close open GR/IR issue
Use efficient handling methods to prevent the damage to the materials.
Inventory Management
Approve RGP/NRGP material gate pass
Define ROL / ROQ for fast moving items in consultation with user and commercial dept to maintain optimum inventory levels while ensuring availability of material for un-interrupted operation.
Monitor shelf-life of non-moving items and dispose in time.
Monitoring of Physical Verification as per SOP
Bill Processing
Check/maintain all physical documents like store register, MRS etc
Park invoice in system to enable Contract Admin / ABEX for doing MIRO and subsequent release of payment.
Prepare SES for fuel transportation bills.
Scrap Disposal
Identify scrap material in co-ordination with user dept, segregate scrap material between usable and non-usable scrap
Dispose as per the terms of Sale Order prepared by Commercial.
New code opening/HSN Mapping/Partner details updation
Conduct stores Daily Review Meeting with team members and address/resolve Pending issues
Attend to internal/external audit queries, provide the data and take corrective actions for the observations received. Update the same in MAAS portal
Manage all stores processes and data as per the IMS standards, update data , attend the audits and address the observations,
Monitor GRN/Quality/DCC/MRS Posting in SAP
Prepare monthly MIS on Inventory Ageing, NMI and Project Inventory and circulate to relevant stakeholders