Highway Surveyor

Year    Cannanore, KL, IN, India

Job Description

1. Planning & Design



Before construction begins, engineers conduct:

Feasibility studies

Traffic surveys

Soil investigation / geotechnical analysis

Environmental impact assessment (EIA)

Alignment and route selection

Design of pavement, drainage, and structures


Outputs include: drawings, specifications, and cost estimates.

2. Site PreparationActivities



Clearing and grubbing (removal of vegetation, debris) Demolition of existing structures Relocation of utilities (water lines, cables, etc.) Earthwork planning and site marking by surveyors

3. Earthworks



This is one of the most important stages.

Processes



Cutting

(removing soil/rock from high areas)

Filling/Embankment

(adding soil to low areas)

Compaction

using rollers

Grading and levelling

to achieve design slope and shape

Materials



Natural soil Selected fill material Rock Stabilized soil (lime/cement treated)

4. Subgrade Preparation



The subgrade is the top of the compacted soil layer.

Tasks



Achieve required

density

and

CBR (California Bearing Ratio)

Shape and level the formation Fix soft spots with soil stabilization or geotextiles

5. Sub-Base and Base Course Construction



These layers provide structural strength above the subgrade.

Sub-base (optional depending on design)



Granular Sub-Base (GSB) Crusher run material

Base Course



Water Bound Macadam (WBM) Wet Mix Macadam (WMM) Cement-treated base (CTB) Bitumen-treated base (BTB)

6. Pavement Construction1. Flexible Pavement (Asphalt Roads)



Layers include:

Prime coat + Tack coat

Binder course (asphalt)

Wearing course (asphalt concrete, SMA, or mastic asphalt)


2. Rigid Pavement (Concrete Roads)



Steps include:

Formwork setting Placing reinforcement (if required) Pouring and vibrating concrete Curing and joint cutting

7. Drainage Construction



Essential to extend pavement life.

Types:

Side drains Culverts Cross drainage structures Stormwater systems Median drains

8. Structures Along the Road



Bridges and culverts Retaining walls Box drains Underpasses and overpasses Guardrails and barriers Road signs and markings

9. Finishing Works



Road shoulders Road marking (thermoplastic, paint) Traffic signs and signals Curbstones Landscaping Street lighting

10. Quality Control & Testing



Common tests:

Soil compaction (Proctor, sand cone) Material gradation Asphalt density and temperature Concrete slump and strength tests Level checks using survey equipment

11. Safety During Construction



Traffic management and signage PPE for workers Hazard identification and control measures Safe equipment operation
Job Type: Full-time

Pay: ?23,000.00 - ?30,000.00 per month

Benefits:

Food provided
Work Location: In person

Beware of fraud agents! do not pay money to get a job

MNCJobsIndia.com will not be responsible for any payment made to a third-party. All Terms of Use are applicable.


Job Detail

  • Job Id
    JD4846556
  • Industry
    Not mentioned
  • Total Positions
    1
  • Job Type:
    Full Time
  • Salary:
    Not mentioned
  • Employment Status
    Permanent
  • Job Location
    Cannanore, KL, IN, India
  • Education
    Not mentioned
  • Experience
    Year